Shop
Showing 65–80 of 6760 results
-

54OH Basement Machine with 20HP Motor, Disc Brake & Traction Sheave Guard – NEMA 4
Add to Quote -

54OH Machine 25 HP Brake/Motor : 230 ft/lb Brake : 600V/3ph/60HZ : Class I & II, Division 1, Groups C, D, E, F, & G : Includes Traction Sheave Guard & Encoder
Add to Quote -

54OH Machine with 15HP Brake/Motor (NEMA 4), Coupling & Traction Sheave Guards : Encoder can not be supplied
Add to Quote -

54OH Machine with 15HP Brake/Motor (NEMA 7/9), Coupling & Traction Sheave Guards : Encoder is not included
Add to Quote -

54OH Machine with 15HP Motor/Encoder, 260 Ft/lb. Drum Brake & Traction Sheave Guard : 3/60/480 Volt : Motor to meet NEMA 4 electrical rating. : Brake has European electrical rating E II 2G k Ex de IIIC T4 Gb
Add to Quote -

54OH Machine with 20HP Motor/Encoder, 260 Ft/lb. Drum Brake & Traction Sheave Guard : 3/60/480 Volt : Motor to meet Class II, Division 1, Groups E, F & G : Brake has European electrical rating E II 2G k Ex de IIIC T4 Gb
Add to Quote -

54OH Machine with 20HP Motor/Encoder, Standard H-W Brake (non-rated) & Traction Sheave Guard : 3/60/575 Volt : Motor to meet Class I, Division 2, Groups C & D : Brake has no electrical classification.
Add to Quote -

54OH Machine with 7.5HP Motor/Encoder, Brake, Traction Sheave & Guard : NEMA 4
Add to Quote -

64OH Machine with 25HP Motor/Encoder, 350 Ft/lb. Drum Brake & Traction Sheave Guard : 3/60/480 Volt : Motor to meet : Class I & II, Division 1, Groups D, E, F & G : Brake has European electrical rating E II 2G k Ex de IIIC T4 Gb
Add to Quote -

6VDC Bell with Box NEMA 4/12
Add to Quote -

74OH Machine with 75 HP Motor (NEMA 4) with HW Brake, Traction Sheave Guard & Brake Release
Add to Quote -

8″ Wide x 4″ High Rigid Plastic Placard w/ 3/8″ Letters Stating “If you intend to go about the 82,630 floor level in the furnace structure, obtain permission from the Control Room before doing so. Never enter this area alone. Combustile gases and a low oxygen atomosphere must be considered present at all times. Caution is always required when at or about the 82,630 floor level. A premanent placard with the same wordkign shall also be installed near the grould level elevator call station.”
Add to Quote -

90 Degree Female 1/4″ NPT – #6 Flare Male
Add to Quote -

90D Adapter for NEMA 4 Box
Add to Quote -

A-B Arm 802T-W2A Adjustable with 1-1/2″ Diameter Nylon Roller
Add to Quote -

A-B Arm 802T-W3A 11-1/2″ Long Rod
Add to Quote